Structured Cabling

Cabling & Network Installation—clean, labeled, and future‑ready.

Cat5e/6/6A and fiber installs with proper pathways, patching, and certification. Enterprise‑quality results for offices, schools, healthcare, and warehouses.

Fluke‑tested
Cert. results provided
Neat racks
Patch mgmt & labels
PoE‑ready
APs, cams, phones
Documented
As‑builts & maps
Technician managing structured cabling rack

What we install & configure

Turnkey low‑voltage services—from rough‑in to certification.

Structured Cabling

Cat5e/6/6A horizontals, terminations, patch panels, labeling, and testing.

  • Faceplates & jacks
  • Cable management
  • As‑built docs

Fiber Optics

Single‑mode & multi‑mode backbones, terminations, patching, and OTDRs.

  • LC/SC/MPO
  • Rack & tray prep
  • Enclosures & splice

Wi‑Fi & PoE

AP placement, PoE switches, cabling for cameras, phones, and IoT.

  • Heat‑map planning*
  • Ceiling/wall mounts
  • Controller config

Racks & Pathways

Racks, cabinets, ladder tray, conduit, penetrations, and firestopping.

  • Neat patch fields
  • Power & grounding
  • Environmental checks

Testing & Certification

Cable certs with printouts, OTDR where applicable, and remediation.

  • Labeling to TIA‑606
  • Link budget review
  • Warranty guidance

Moves/Adds/Changes

Relocations, expansions, swing spaces, and cutover nights/weekends.

  • Phased schedules
  • Downtime planning
  • On‑site support

*Heat‑map planning uses floor plans and typical attenuation assumptions; on‑site survey available.

Cabling Standards

TIA‑568TIA‑569TIA‑606ISO/IEC

Environment

CMP/PlenumCMR/RiserEMI considerations

PoE & Power

802.3af/at/btBudget planningUPS & grounding

Safety

FirestoppingLadder/Conduit fillLabeling & IDs

We align to your facilities policies and applicable codes. Your organization remains responsible for overall code compliance and permits.

Engagement options

Choose a starting point—scale as your space grows.

Survey

Site Walk

Floor plan review, counts, pathways, and estimate.

  • AP & drop layout
  • Rack/location plan
  • Timeline & phases
Schedule
Small Office

Starter Bundle

Up to 24 drops, small rack, patching, and APs.

  • Labeling & certs
  • PoE planning
  • As‑builts
Request Pricing
Most Popular
Expansion

Renovation/Build‑out

Phased install in live spaces, swing areas, and cutovers.

  • Off‑hours options
  • Coordination w/ GC
  • Change management
Request Pricing
Enterprise

New Construction

Design‑build: MDF/IDF, pathways, BOS, and acceptance testing.

  • Submittals & shop dwgs
  • Inspections
  • Closeout package
Request Pricing

How we work

1 · Discover

Site walk, counts, and constraints.

2 · Design

Paths, racks, APs, and BOM.

3 · Install

Pull, terminate, label, patch.

4 · Certify

Fluke/OTDR & remediation.

5 · Hand‑off

As‑builts & support plan.

FAQ

Materials, timelines, and documentation—at a glance.

Plenum vs. riser—what do I need?

Plenum (CMP) is for air‑handling spaces; riser (CMR) is for vertical runs between floors. We’ll specify based on your building and AHJ requirements.

When should I choose fiber?

Fiber is ideal for long runs, inter‑closet backbones, or high bandwidth/EMI environments. Copper is cost‑effective for shorter horizontal runs.

How long does a typical install take?

Small offices can wrap in 1–3 days. Larger phased projects follow construction schedules; we can work off‑hours to avoid downtime.

Do you provide as‑built documentation?

Yes—label schema, device maps, test printouts, and photos are included at hand‑off.

Schedule a site visit

Share your floor plan and drop counts—get a precise plan and quote.

Or email info@kingtech.net

Visit or call us

  • 3 N Old State Capitol Plaza, Springfield, IL 62701
  • (217) 522‑6700
  • info@kingtech.net
Downtown Springfield